Arnold Palmer’s Bay Hill 25 Year Test Building
Terra Block’s 25 year-old building at Arnold Palmer’s
Bay Hill Golf Course passes Inspection.
The
building was Terra Block’s first structure to use the
unique “dry-stack” blocks laying method of
construction. It has survived many storms and
hurricanes with no problems for 25 years.
A
Terra Block wall has been independently wind-tested to
210 mph.
A new
breakthrough method of laying the blocks using “Polymer
Fusion Technology™” by gluing the blocks together is
calculated to withstand 300 mph winds or more.
While dry-stacking blocks is a usable method, “Polymer
Fusion Technology™” is a quantum leap forward in Earth
Block construction worldwide.
“Polymer Fusion Technology™” is a trademark of Terra
Block.
Copyrighted – All Rights Reserved.
|